Legislation # 08-0340 Enactment Number none
Type Planning Actions - Use Permit Effective Date none
Introduction Date 8/20/2008
Title Use Permit Application No. 1041 by Cellco Partnership d/b/a Verizon Wireless to Amend the Tower height Condition from Approved Use Permit #767. The Proposed Condition will Change the Maximum Height from 150’ to 160’ (not including the 4’ lightning rod). The Property is Located at 6 Shuttle Court (LRSN# 6001169) and is Approximately .41 ± acres.
 
Legislation History 08-0340
DateNotice Of ActionDescription
8/20/2008 Approved
8/20/2008 Held Public Hearing
8/7/2008 Received By Clerk's Office
 
View Attachments 08-0340
FileTypeSizeDescription
CityCouncilPPresentation.ppt Power Point Presentation 621K PowerPoint Presentation
Signed Application.pdf Application 203K Application
Wythe Creek Tower Extension Conditions.pdf Exhibit 14K Use Permit Conditions
Staff Report UP 1041.pdf Staff Report 273K Staff Report
SitePlan.pdf Exhibit 1333K Site Plan
PC ScannedResolution.pdf PC Resolution 249K PC Resolution
 
Legislation Text 08-0340
Unable to locate legislation text