Legislation # 06-0390 Enactment Number none
Type Resolution Effective Date none
Introduction Date 7/19/2006
Title Programming and Local Administration of Twelve (12) Projects in the VDOT 6-Year Plan: 1) Citywide Wayfinder Signs – Engineering Services Project 07-021 2) Coliseum Central Transit Shelters – Engineering Services Project 07-015 3) Big Bethel Road/Radford Drive Traffic Signal Installation – Engineering Services Project 07-013 4) Big Bethel Road/Todds Lane Intersection Improvements – Engineering Services Project 07-014 5) Coliseum Drive/Cunningham Drive Intersection Improvements – Engineering Services Project 07-011 6) Mercury Boulevard/Fox Hill Road Intersection Improvements – Engineering Services Project 07-020 7) Hampton Roads Center Parkway/Big Bethel Road Intersection Improvements – Engineering Services Project 07-012 8) Citywide Automotive Vehicle Location (AVL) for Emergency Services Vehicles – Engineering Services Project 07-016 9) Citywide Traffic Signal System Upgrade – Phase II – Engineering Services Project 07-019 10) Citywide CCTV Camera Installations – Phase II – Engineering Services Project 07-017 11) Citywide Traffic Signal System Retiming - Engineering Services Project 07-018 12) Hampton Electric Automated Transit (HEAT) – Engineering Services Project 07-023
 
Legislation History 06-0390
DateNotice Of ActionDescription
7/19/2006 Approved items 1 and 2 and 4 through 20 on the consent agenda.
6/30/2006 Received By Clerk's Office
 
View Attachments 06-0390
FileTypeSizeDescription
No attachment(s) found
 
Legislation Text 06-0390

 

City of Hampton, Virginia

Resolution

22 Lincoln Street

Hampton, VA 23669

www.hampton.gov

 

File Number: 06-0390

 

Enactment Number: -

Programming and Local Administration of Twelve (12) Projects in the VDOT 6-Year Plan:

 

1) Citywide Wayfinder Signs Engineering Services Project 07-021

 

2) Coliseum Central Transit Shelters Engineering Services Project 07-015

 

3) Big Bethel Road/Radford Drive Traffic Signal Installation Engineering Services

Project 07-013

4) Big Bethel Road/Todds Lane Intersection Improvements Engineering Services

Project 07-014

5) Coliseum Drive/Cunningham Drive Intersection Improvements Engineering Services

Project 07-011

6) Mercury Boulevard/Fox Hill Road Intersection Improvements Engineering Services

Project 07-020

7) Hampton Roads Center Parkway/Big Bethel Road Intersection

Improvements Engineering Services Project 07-012

8) Citywide Automotive Vehicle Location (AVL) for Emergency Services Vehicles

Engineering Services Project 07-016

9) Citywide Traffic Signal System Upgrade Phase II Engineering Services

Project 07-019

 

10) Citywide CCTV Camera Installations Phase II Engineering Services Project 07-017

11) Citywide Traffic Signal System Retiming - Engineering Services Project 07-018

12) Hampton Electric Automated Transit (HEAT) Engineering Services Project 07-023

 

RESOLUTION REQUESTING THE VIRGINIA DEPARTMENT OF TRANSPORTATION TO PROGRAM THE FOLLOWING PROJECTS INTO THE 6-YEAR PLAN, AND AUTHORIZING THE CITY MANAGER TO EXECUTE PROJECT ADMINISTRATION AGREEMENTS AND CITY/STATE AGREEMENTS FOR IMPLEMENTATION OF THESE PROJECTS.

 

WHEREAS, in accordance with the Virginia Department of Transportation (VDOT) construction allocation procedures, it is necessary that a request by a City Council resolution be made in order that the Department program a highway project in the City of Hampton, and

 

WHEREAS, CMAQ (Congestion Mitigation/Air Quality) funds have been allocated for these twelve (12) new transportation related projects at 100% federal and state cost; and

 

WHEREAS, Project Administration Agreements with VDOT are necessary for securing VDOT's commitment on the federal and state funding of these projects; and

 

WHEREAS, VDOT requires that City Council grant authority for the City Manager to execute project administration agreements and City/State Agreements for implementation of these projects; and

 

WHEREAS, through local administration by City staff, projects can be completed in a more efficient manner with less administrative expense,

 

NOW, THEREFORE, BE IT RESOLVED that the City of Hampton, Virginia requests the Virginia Department of Transportation to program the following projects in the 6-year plan for fiscal years 2007 to 2010:

 

1) Citywide Wayfinder Signs

 

2) Coliseum Central Transit Shelters

 

3) Big Bethel Road/Radford Drive Traffic Signal Installation

4) Big Bethel Road/Todds Lane Intersection Improvements

5) Coliseum Drive/Cunningham Drive Intersection Improvements

6) Mercury Boulevard/Fox Hill Road Intersection Improvements

7) Hampton Roads Center Parkway/Big Bethel Road Intersection Improvements

8) Citywide Automatic Vehicle Location (AVL) for Emergency Services Vehicles

9) Citywide Traffic Signal System Upgrade Phase II

10) Citywide CCTV Camera Installations Phase II

11) Citywide Traffic Signal System Retiming

12) Hampton Electric Automated Transit (HEAT)

 

BE IT FURTHER RESOLVED that the City Manager is authorized to execute Project Administration Agreements with VDOT for City administration of these projects.

 

BE IT FURTHER RESOLVED that the City Manager is authorized to execute City/State Agreements with VDOT for the construction of these projects.

 

Adopted at the regular meeting of the City Council of the City of Hampton, Virginia held on July 19, 2006.

 

 

 

Signed by ____________________________ Date _________________

Ross A. Kearney, II, Mayor

 

 

 

 

Attested by ____________________________ Date _________________

Katherine K. Glass

Clerk of the Council