Legislation # 07-0214 Enactment Number none
Type Resolution - Budget Item Effective Date none
Introduction Date 4/11/2007
Title Resolution Designating Ritchie Curbow Construction Company, Inc. to Perform Advance Site Work for the Boo Williams Indoor Sports Facility at Armistead Pointe – Engineering Services Project No. 06-008.
 
Legislation History 07-0214
DateNotice Of ActionDescription
4/11/2007 Approved consent agenda items 1 through 8 and 10 through 15.
4/2/2007 Received By Clerk's Office
 
View Attachments 07-0214
FileTypeSizeDescription
No attachment(s) found
 
Legislation Text 07-0214

 

City of Hampton, Virginia

Resolution - Budget Item

22 Lincoln Street

Hampton, VA 23669

www.hampton.gov

 

File Number: 07-0214

 

Enactment Number: -

 

Resolution Designating Ritchie Curbow Construction Company, Inc. to Perform Advance Site Work for the Boo Williams Indoor Sports Facility at Armistead Pointe Engineering Services Project No. 06-008.

 

WHEREAS, Council had previously approved the Boo Williams Indoor Sports Facility project for development at the Citys Armistead Point property; and

 

WHEREAS, per the Development Agreement, Boo Williams is responsible for the design and construction of the building improvements, and the City is responsible for the design and construction of the site improvements required for the facility; and

 

WHEREAS, some of the site work must take place in advance of the building construction, including the clearing for, and the excavation of, a storm water management facility, the installation of a temporary access road to the site and the installation of perimeter erosion control measures; and

 

WHEREAS, this advance site work has been designed and permits have been obtained; and

 

WHEREAS, Boo Williams building contractor Ritchie Curbow Construction Company, Inc. is ready to begin clearing and land disturbing activities for the building pad; and

 

WHEREAS, while Boo Williams contractor is preparing the building pad, it is I the Citys interest to also have that contractor perform the advance site work, in terms of savings to the City on mobilization cost for clearing and excavation, and improved construction coordination; and

 

WHEREAS, Ricthie Curbow has provided a cost quotation to the City for this advance site work in the amount of $209,574.00, which is based on competitive quotes from subcontractors.

 

NOW, THEREFORE BE IT RESOLVED that the firm of Ritchie Curbow Construction Company Inc. is hereby designated to perform advance site work for the Boo Williams Indoor Sports Facility project.

 

Adopted at the regular meeting of the City Council of the City of Hampton, Virginia held on April 11, 2007.

 

 

 

Signed by ____________________________ Date _________________

Ross A. Kearney, II, Mayor

 

 

 

 

Attested by ____________________________ Date _________________

Katherine K. Glass

Clerk of the Council