Legislation # 05-0749 Enactment Number none
Type Resolution Effective Date none
Introduction Date 12/14/2005
Title Hampton Roads Convention Center – Post-Construction Architectural Consulting Services
 
Legislation History 05-0749
DateNotice Of ActionDescription
12/14/2005 Adopted items 1 through 24 on consent agenda.
12/7/2005 Received By Clerk's Office
 
View Attachments 05-0749
FileTypeSizeDescription
No attachment(s) found
 
Legislation Text 05-0749

 

City of Hampton, Virginia

Resolution

22 Lincoln Street

Hampton, VA 23669

www.hampton.gov

 

File Number: 05-0749

 

Enactment Number: -

 

Hampton Roads Convention Center Post-Construction Architectural Consulting Services

 

RESOLUTION

 

RESOLUTION

 

A resolution designating the consulting firm of Hellmuth, Obata and Kassabaum, PC, (HOK) to provide post construction architectural consulting services for the Hampton Roads Convention Center, in an amount not to exceed $70,000.

 

 

WHEREAS, in 2004, Council approved a resolution increasing the contract limit for HOKs construction administration services for the Hampton Roads Convention Center, by $700,000, to $7.2 million; and

 

WHEREAS, it was previously projected that the construction contract with W.M. Jordan would be closed out by June 30, 2005 and the cost for HOKs services had been estimated through that date; and

 

WHEREAS, the construction contract is now expected to be closed out by December 30, 2005; and

 

WHEREAS, since June 30th, additional HOK services have been provided such as punch list follow-up and consultation on a number of quality control and aesthetic features in the building and minor modifications which were necessary to ensure a higher quality and more functional facility; and

 

WHEREAS, HOK services will be needed periodically throughout the initial year of operation of the building for post construction follow up consultation; and

 

WHEREAS, these additional architectural services are projected to cost approximately $70,000; and

 

WHEREAS, funds for these services are available in the Convention Center project account.

 

NOW, THEREFORE, BE IT RESOLVED that the previously authorized $7.2 million contract limit is hereby increased by $70,000, for post-construction architectural consulting services.

 

 

 

 

 

 

 

Adopted at the regular meeting of the City Council of the City of Hampton, Virginia held on December 14, 2006.

 

 

 

Signed by ____________________________ Date _________________

Ross A. Kearney, II, Mayor

 

 

 

 

Attested by ____________________________ Date _________________

Katherine K. Glass

Clerk of the Council